Our case studies Every year we undertake hundreds of different projects, some of which are worth describing because of their technical and organizational challenges. MWS attendance at OWF Waterslide installation on board cruise vessels WTG O&M and component exchange Air Lubrication System retrofit on board a cruise vessel Retrofit Membrane Bio Reactor Retrofit on board a cruise vessel Cruise Vessel – HVAC system upgrading WTG Secondary Steel load-out and installation HVAC UV lamps installation on a Large Cruise Vessel Luxury Cruise Ship 1C-ICE Class conversion Selective Catalytic Reduction (SCR) Installation MAGS installation Sky Princess Scrubber Installation Quick Repair of damaged GRE piping Pacific Explorer Scrubber Installation EGCS retrofit with the exhaust gas towers manufactured on board during the vessel’s operation. Chiller replacement A complex electrical installation for the offshore industry.